EPC tender issued for 1 MW of rooftop solar systems and 1000 solar street lights

Odisha Renewable Energy Development Agency (OREDA) tendered to engineering, procurement and construction (EPC) contractors for the design, engineering, supply, installation and commissioning of 1MW rooftop solar systems and 1,000 solar street lights in 50 Odisha Aadarsha Vidyalaya premises in ten districts. The successful tenderer will also have to take care of maintenance activities for five years.

Odisha Aadarsha Vidyalaya is a chain of schools expected to be installed in each of the block’s 314 headquarters. These Adarsha Vidyalayas are full-time boarding schools offering free education from class VI to class XII. The schools are administered by Odisha Adarsha Vidyalaya Sangathan.

Each of the 50 grid-connected solar roof systems must have a capacity of 20 kW with a net metering installation and a 50% battery back-up. In each school, 20 solar street lights must be installed.

The deadline for submitting bids online is January 19, 2022. Bids will open on January 21.

The estimated cost of the project is 148.55 million yen (~ $ 1.99 million).

The successful bidder will be required to provide an amount of 1.49 million yen (~ $ 19,970) as a bid security deposit.

The tender is open to general category bidders and bidders who are local micro, small and medium enterprises (MSMEs) and registered under the MSME Development Act 2006 in Odisha.

Bidders must have valid test certificates for solar modules, inverters, batteries and street lighting systems from the Department of New and Renewable Energy and test labs authorized by the Bureau of Indian Standards only.

They must have established high quality, environmental management system and information security standards and have ISO 9001 and ISO 14001 certifications for solar photovoltaic modules, inverters, batteries and power systems. public lighting.

For Category A, bidders must have experience installing and commissioning rooftop solar systems in at least 100 schools recognized by the government of Odisha within the past five years.

They should have a good track record in servicing the solar power plants installed in Odisha for five years. They must have properly maintained the solar systems installed in the above 100 schools. The average functionality rate on the last offer submission date must be greater than 90%.

In the past three fiscal years, bidders must have an average annual turnover of at least 60 million yen (~ $ 805,484). They must have positive net worth in the past fiscal year.

OREDA said that only locally manufactured solar modules should be used for the projects, and the efficiency of the module should not be less than 12%.

Previously, OREDA had tendered to install 1.47 MW of rooftop solar projects and 2,045 solar street lighting systems in 115 offices in Panchayat Samiti in the state.

Subscribe to Mercom’s India Solar Tender Tracker for timely updates on all solar tenders issued by various agencies in India.